
Guaranteed Success in SAP Certified Associate C-P2W43-2023 Exam Dumps
SAP C-P2W43-2023 Daily Practice Exam New 2026 Updated 82 Questions
NEW QUESTION # 24
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A. Create a task list for functional location
- B. Assign a subordinate piece of equipment.
- C. Assign documents
- D. Edit classification data and characteristics.
- E. Change a reference location.
Answer: C,D,E
NEW QUESTION # 25
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?
- A. Serial data
- B. Warranty
- C. Configuration
- D. Manufacturer data
Answer: B,D
NEW QUESTION # 26
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Planned date of the next call, independent of maintenance order dates
- B. The date of the final confirmation
- C. Technical completion date of the maintenance order
- D. Actual finish date of the maintenance order
Answer: C
NEW QUESTION # 27
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question
- A. Status profile
- B. Measuring point category
- C. Object information
- D. Warranty category
- E. Usage period
Answer: A,B,C
NEW QUESTION # 28
What do you have to consider when setting up phase-based maintenance?
- A. It comes preconfigured when using the relevant Best Practices scope items.
- B. It can be used with any existing order type.
- C. It is mandatory for breakdown and preventive maintenance.
- D. It is not possible to configure the nine delivered phases.
Answer: A
NEW QUESTION # 29
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question
- A. Cancel status Released.
- B. Change the estimated costs.
- C. Change the pronty
- D. Book a goods receipt.
Answer: C,D
NEW QUESTION # 30
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (annual performance/365)
- B. Cycle length divided by (monthly performance x 12)
- C. Cycle length divided by ((scheduling period) x (cycle modification factor))
- D. Cycle length divided by annual performance
Answer: D
NEW QUESTION # 31
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?
- A. SAP Asset Strategy and Performance Management
- B. SAP Lumira Designer
- C. SAP S/4HANA Core Data Services
- D. SAP Predictive Analysis
Answer: C
NEW QUESTION # 32
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question
- A. Assign the BOM usage for free assignment of material in Customizing
- B. Assign the header material of a material BOM as assembly to a task list operation.
- C. Assign a piece of equipment with allocated material BOM to a task list operation.
- D. Assign the header material of a material ROM to the assembly field of the task list header
Answer: A,B
NEW QUESTION # 33
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question
- A. It defines the allowed characters for a functional location
- B. It sets the hierarchy levels of the functional location structure.
- C. It restricts the number of hierarchical levels to no more than 6
- D. It limits the types of characters in the edit mask to Alpha and Numeric.
Answer: B,D
NEW QUESTION # 34
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question
- A. Plan repair work for the responsible work center
- B. Complete the malfunction report
- C. Verify planned and actual costs
- D. Assign a production resource tool (PRT) to the operation
- E. Find malfunction records already created in a list
Answer: A,B,E
NEW QUESTION # 35
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note:
There are 3 correct answers to this question
- A. Overall costs are dynamically summed up on the header level.
- B. A technical object must be assigned to an order operation
- C. Purchase requisitions have the operation as account assignment.
- D. Costs are stored only for the operation object
- E. The settlement rule is maintained on the header level.
Answer: A,B,D
NEW QUESTION # 36
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?
- A. Analyze overdue maintenance orders that have NOT been finally confirmed
- B. Analyze confirmed maintenance orders that have NOT been settled.
- C. Display approved purchase requisitions for which NO purchase orders have been generated
- D. Analyze maintenance orders that are still in planning and have NOT been released.
- E. Display approved purchase requisitions for which purchase orders have been generated.
Answer: A,C,E
NEW QUESTION # 37
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question
- A. Maintain a serial number for an existing equipment master.
- B. Assign a serial number profile to an additional business view for equipment category
- C. Assign a serial number profile to the related material master.
- D. Assign a serial number profile to the equipment category
- E. Add a serialized material to the equipment serial data view.
Answer: C,D,E
NEW QUESTION # 38
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.
- A. An object list must have been generated manually or automatically.
- B. A PM task list with inspection point type must be assigned to the maintenance order
- C. An Inspection Plan and a technical object must be assigned to the same class.
- D. A checklist type must be assigned to the maintenance order header.
Answer: B,C
NEW QUESTION # 39
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A. Release Start Work
- B. Complete Close Report
- C. Release Print
- D. Schedule Dispatch
Answer: A,B
NEW QUESTION # 40
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?
- A. It can be assigned directly to the user via personalization
- B. It is based on an SAP Fiori tile catalog.
- C. It is assigned via a portal role.
- D. It provides only HTML5-based apps
Answer: A,B
NEW QUESTION # 41
......
Test Engine to Practice C-P2W43-2023 Test Questions: https://www.vceprep.com/C-P2W43-2023-latest-vce-prep.html
Use Valid C-P2W43-2023 Exam - Actual Exam Question & Answer: https://drive.google.com/open?id=1H64FyqmpuZ-bByzSmuI5ajkdDU-_cUrS