Guaranteed Success in SAP Certified Associate C-P2W43-2023 Exam Dumps [Q24-Q41]

Share

Guaranteed Success in SAP Certified Associate C-P2W43-2023 Exam Dumps

SAP C-P2W43-2023 Daily Practice Exam New 2026 Updated 82 Questions

NEW QUESTION # 24
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Create a task list for functional location
  • B. Assign a subordinate piece of equipment.
  • C. Assign documents
  • D. Edit classification data and characteristics.
  • E. Change a reference location.

Answer: C,D,E


NEW QUESTION # 25
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

  • A. Serial data
  • B. Warranty
  • C. Configuration
  • D. Manufacturer data

Answer: B,D


NEW QUESTION # 26
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Planned date of the next call, independent of maintenance order dates
  • B. The date of the final confirmation
  • C. Technical completion date of the maintenance order
  • D. Actual finish date of the maintenance order

Answer: C


NEW QUESTION # 27
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Status profile
  • B. Measuring point category
  • C. Object information
  • D. Warranty category
  • E. Usage period

Answer: A,B,C


NEW QUESTION # 28
What do you have to consider when setting up phase-based maintenance?

  • A. It comes preconfigured when using the relevant Best Practices scope items.
  • B. It can be used with any existing order type.
  • C. It is mandatory for breakdown and preventive maintenance.
  • D. It is not possible to configure the nine delivered phases.

Answer: A


NEW QUESTION # 29
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

  • A. Cancel status Released.
  • B. Change the estimated costs.
  • C. Change the pronty
  • D. Book a goods receipt.

Answer: C,D


NEW QUESTION # 30
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by (annual performance/365)
  • B. Cycle length divided by (monthly performance x 12)
  • C. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • D. Cycle length divided by annual performance

Answer: D


NEW QUESTION # 31
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP Asset Strategy and Performance Management
  • B. SAP Lumira Designer
  • C. SAP S/4HANA Core Data Services
  • D. SAP Predictive Analysis

Answer: C


NEW QUESTION # 32
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

  • A. Assign the BOM usage for free assignment of material in Customizing
  • B. Assign the header material of a material BOM as assembly to a task list operation.
  • C. Assign a piece of equipment with allocated material BOM to a task list operation.
  • D. Assign the header material of a material ROM to the assembly field of the task list header

Answer: A,B


NEW QUESTION # 33
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question

  • A. It defines the allowed characters for a functional location
  • B. It sets the hierarchy levels of the functional location structure.
  • C. It restricts the number of hierarchical levels to no more than 6
  • D. It limits the types of characters in the edit mask to Alpha and Numeric.

Answer: B,D


NEW QUESTION # 34
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Plan repair work for the responsible work center
  • B. Complete the malfunction report
  • C. Verify planned and actual costs
  • D. Assign a production resource tool (PRT) to the operation
  • E. Find malfunction records already created in a list

Answer: A,B,E


NEW QUESTION # 35
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note:
There are 3 correct answers to this question

  • A. Overall costs are dynamically summed up on the header level.
  • B. A technical object must be assigned to an order operation
  • C. Purchase requisitions have the operation as account assignment.
  • D. Costs are stored only for the operation object
  • E. The settlement rule is maintained on the header level.

Answer: A,B,D


NEW QUESTION # 36
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

  • A. Analyze overdue maintenance orders that have NOT been finally confirmed
  • B. Analyze confirmed maintenance orders that have NOT been settled.
  • C. Display approved purchase requisitions for which NO purchase orders have been generated
  • D. Analyze maintenance orders that are still in planning and have NOT been released.
  • E. Display approved purchase requisitions for which purchase orders have been generated.

Answer: A,C,E


NEW QUESTION # 37
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

  • A. Maintain a serial number for an existing equipment master.
  • B. Assign a serial number profile to an additional business view for equipment category
  • C. Assign a serial number profile to the related material master.
  • D. Assign a serial number profile to the equipment category
  • E. Add a serialized material to the equipment serial data view.

Answer: C,D,E


NEW QUESTION # 38
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

  • A. An object list must have been generated manually or automatically.
  • B. A PM task list with inspection point type must be assigned to the maintenance order
  • C. An Inspection Plan and a technical object must be assigned to the same class.
  • D. A checklist type must be assigned to the maintenance order header.

Answer: B,C


NEW QUESTION # 39
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question

  • A. Release Start Work
  • B. Complete Close Report
  • C. Release Print
  • D. Schedule Dispatch

Answer: A,B


NEW QUESTION # 40
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?

  • A. It can be assigned directly to the user via personalization
  • B. It is based on an SAP Fiori tile catalog.
  • C. It is assigned via a portal role.
  • D. It provides only HTML5-based apps

Answer: A,B


NEW QUESTION # 41
......

Test Engine to Practice C-P2W43-2023 Test Questions: https://www.vceprep.com/C-P2W43-2023-latest-vce-prep.html

Use Valid C-P2W43-2023 Exam - Actual Exam Question & Answer: https://drive.google.com/open?id=1H64FyqmpuZ-bByzSmuI5ajkdDU-_cUrS