API-570 exam covers various topics such as inspection planning, corrosion mechanisms, materials, welding, and non-destructive testing techniques. API-570 exam consists of 150 multiple-choice questions and is conducted for a duration of 6 hours. The candidates are required to have a minimum of 3 years of relevant experience in the field of piping inspection and must meet the eligibility criteria specified by API. Passing the API-570 exam demonstrates the candidate's ability to identify and analyze potential issues in piping systems and provide solutions to ensure safety and integrity. It is a highly sought after certification in the oil and gas industry and provides excellent career growth opportunities for the certified individuals.
NEW QUESTION # 12
During a MT examination, shall be performed on each area.
- A. a calibration of each piece of magnetizing equipment
- B. prod spacing of at least
- C. 100% coverage at the required sensitivity
- D. at least three separate examinations
Answer: C
NEW QUESTION # 13
What is the maximum allowable deviation for the ammeter on each piece of magnetizing equipment?
- A. 10%
- B. 20%
- C. 30%
- D. 15%
Answer: A
NEW QUESTION # 14
The type of joints generally limited to piping in non critical service NPS 2 and smaller is.
- A. brazed
- B. butt welded
- C. clamped
- D. threaded
Answer: D
NEW QUESTION # 15
What is the minimum holding time of SA-106 Grade B, 1 inch thick material?
- A. 1 hour
- B. 2.4 hours
- C. 2 hours
- D. not specified
Answer: A
NEW QUESTION # 16
Give the corresponding "P" number for SA 414 Gr.A material
- A. 11B
- B. 0
- C. 1
- D. 2
Answer: D
NEW QUESTION # 17
When heat treating welded joints between dissimilar ferritic metals, the temperature range shall be for which metal?
- A. The one with the higher temperature range
- B. The one with the lower temperature range
- C. The average of both materials
- D. Either one may be used
Answer: A
NEW QUESTION # 18
The repair organization shall use welders and welding operators qualified in accordance with the code to which the piping was built or alternatively_____.
- A. ASME Section V
- B. ASME B 31.3
- C. API 1104
- D. AWS D 1.1
Answer: B
NEW QUESTION # 19
The letter "B" is placed on radiographic film holder for what reason?
- A. To function as a location marker for the radiograph
- B. To designate whether the penetrameter is on the film side or the back side
- C. To show the distance from the source of radiation to the weld
- D. To determine if back scatter radiation is exposing the film
Answer: D
NEW QUESTION # 20
Exemptions for preheating and post weld heat treatment must be approved by the____.
- A. applicable standard, API 570
- B. inspector
- C. repair procedure.
- D. piping engineer
Answer: D
NEW QUESTION # 21
Geometric unsharpness of the radiograph of a component under 2" th1ck shall not exceed
- A. 0.040"
- B. 0.050"
- C. 0.020"
- D. 0.030"
Answer: C
NEW QUESTION # 22
Piping subject to CUI includes piping insulated for personnel protection, especially:
- A. carbon steel piping systems operating between 25°F-250°F
- B. carbon steel piping systems
- C. glass lined piping
- D. plastic piping
Answer: A
NEW QUESTION # 23
An inspector is evaluating a radiograph, a light image of a "B" appears on a darker background of the radiograph, the.
- A. "B" is for identification of the welder
- B. radiograph should not be rejected
- C. "B" is for identification of the weld
- D. radiograph shall be considered unacceptable
Answer: D
NEW QUESTION # 24
Who has the responsibility for qualifying welding procedures?
- A. Each welder
- B. Each employer
- C. Each subcontractor
- D. Each contractor
Answer: B
NEW QUESTION # 25
What is the pressure design thickness of NPS10A516 Gr.65 Type 22 pipe that operateat 1200psig/750°F
- A. 0.432"
- B. Not enough in formation given
- C. 0.46"
- D. 0.928"
Answer: C
NEW QUESTION # 26
After hot bending and forming, heat treatment is required for which P numbers?
- A. 1, 2 and 7
- B. 3,4,5, 6 and 10A
- C. 11ASG1 and 11ASG2
- D. 1,2,8,9A and 98
Answer: B
NEW QUESTION # 27
For 1 1/4" thick carbon steel, what is the recommended preheat temperature?
- A. 235°F
- B. 175°F
- C. 300°F
- D. None
Answer: B
NEW QUESTION # 28
What is the maximum measurement for open defects in the weld or heat affect zone for a guided bend specimen?
- A. 3/16"
- B. No open defects are allowed
- C. 1/16"
- D. 1/8"
Answer: D
NEW QUESTION # 29
The base metal is P No.1, the weld metal is A No.1, and the wall thickness is 7/8".
What is the holding time at 1100- 1200?F for heat treatment
- A. 3 hours
- B. 1 hour
- C. Procedure is not required for this thickness
- D. 2 hours
Answer: B
NEW QUESTION # 30
......
API-570 exam covers a wide range of topics related to piping inspection, including inspection procedures, testing methods, materials, and corrosion mechanisms. It is intended for individuals who have experience in the field of piping inspection and maintenance and who are seeking certification to demonstrate their proficiency in this area.