[Jan-2023] HQT-4180 Questions - Truly Beneficial For Your Hitachi Exam [Q22-Q43]

Share

[Jan-2023] HQT-4180 Questions - Truly Beneficial For Your Hitachi Exam

Download Hitachi HQT-4180 Sample Questions


Hitachi HQT-4180 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the VSP midrange storage systems drive sparing technology and concepts
  • Back-end Architecture
Topic 2
  • Describe the back-end hardware components of VSP midrange storage systems
  • Identify the VSP midrange storage systems documentation
Topic 3
  • Describe how program products are enabled on VSP midrange storage systems
  • Describe the back-end architcture of VSP midrange storage systems
Topic 4
  • Describe the different VSP midrange storage systems models and their specifications
  • System architecture
Topic 5
  • Describe the installation and initial configuration procedures for VSP midrange storage systems
  • System Installation

 

NEW QUESTION 22
What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)

  • A. from DKA to DKB
  • B. from DKB to ENC
  • C. from ENC to ENC
  • D. from DKA to SSW

Answer: A,B

 

NEW QUESTION 23
Which two statements are correct when adding cache to a VSP E590? (Choose two.)

  • A. Cache Modules must be installed on the CM board.
  • B. Cache modules must be installed in CMG1.
  • C. CMG0 and CMG1 must have the same DIMM type.
  • D. This is not supported online.

Answer: B,C

 

NEW QUESTION 24
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  • A. Enable Host Group security.
  • B. Enable Port Security.
  • C. Scan for all WWNs.
  • D. Create a Host Group.

Answer: C

 

NEW QUESTION 25
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

  • A. Use the Maintenance Utility for blocking the PS, then replace it.
  • B. Use the Maintenance Utility for blocking the controller, then replace the PS.
  • C. Check if the status of the PS is blocked, and if yes, then replace it directly.
  • D. Use the MPC for blocking the PS, then replace it.

Answer: D

 

NEW QUESTION 26
What are two functions of the LAN Blade in the VSP Midrange family? (Choose two.)

  • A. It provides the management port connecting to the customer LAN.
  • B. It provides the maintenance port connecting to the MPC.
  • C. It provides the LAN connection to the file module.
  • D. It provides the iSCSI connection to the servers.

Answer: A,C

 

NEW QUESTION 27
Which tool do you use to install license keys on a VSP G370 system?

  • A. MPC Software
  • B. Storage Navigator
  • C. HSA Embedded
  • D. Maintenance Utility

Answer: D

 

NEW QUESTION 28
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

  • A. 7D + 1P
  • B. 8D + 1P
  • C. 10D + 2P
  • D. 2D + 2D
  • E. 4D + 1P

Answer: B,C,E

 

NEW QUESTION 29
You need to replace a broken fan in a VSP E1090.
What is the correct procedure?

  • A. Remove the broken fan, then replace it.
  • B. Use the MPC for blocking the fan, then replace it.
  • C. Use Storage Navigator for blocking the fan, then replace it.
  • D. Use the Maintenance Utility for stopping the fan, then replace it.

Answer: A

 

NEW QUESTION 30
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)

  • A. The license keys are deleted.
  • B. The MPC software is updated.
  • C. All the data on RAID groups is lost.
  • D. The SVP drive is formatted.

Answer: C,D

 

NEW QUESTION 31
Which tool is used for the remote monitoring of a VSP N800 system?

  • A. Hitachi Remote Ops SVP Agent
  • B. MPC Software
  • C. Hitachi Remote Ops Monitor Agent
  • D. Hitachi Performance Monitor

Answer: C

 

NEW QUESTION 32
A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.
Which two actions are automatically performed by the system? (Choose two.)

  • A. An alert is generated.
  • B. The RAID group is placed in Correction Access.
  • C. Dynamic Sparing is started.
  • D. The Correction Copy process starts.

Answer: A,C

 

NEW QUESTION 33
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers

  • A. upgrading from G200 to G800
  • B. adding a DB60 drive tray
  • C. adding a DKB
  • D. upgrading from G200 to G600

Answer: B,C

 

NEW QUESTION 34
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)

  • A. Storage Navigator
  • B. HSA Embedded
  • C. Initial Setup Wizard
  • D. Maintenance Utility

Answer: C,D

 

NEW QUESTION 35
Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)

  • A. VSP F700
  • B. VSP E590
  • C. VSP F370
  • D. VSP G900

Answer: A,B

 

NEW QUESTION 36
......

Truly Beneficial For Your Hitachi Exam: https://www.vceprep.com/HQT-4180-latest-vce-prep.html

Real HQT-4180 Exam Questions and Answers FREE: https://drive.google.com/open?id=1ti198QPNx_8_8lLxF0jceqVom2rhD_wP